My only concern on the existing Sumiko is that it may just be a tad light for the Zeta.
It was originally about $850 new, not sure if I would spend $500 to $600 on a rebuild.
It will likely not have the same boron cantilever on return.
Now it is entirely possible that the OP may really like the sound of the rebuilt cart but is an expensive gamble IMHO.
It was originally about $850 new, not sure if I would spend $500 to $600 on a rebuild.
It will likely not have the same boron cantilever on return.
Now it is entirely possible that the OP may really like the sound of the rebuilt cart but is an expensive gamble IMHO.